Real sites at every stage of the deal cycle, from raw land to notice to proceed. Each opportunity in our portfolio is organized, documented, and ready for the right capital and operator partners.
A 300 MW shovel-ready AI data campus in North Carolina with reserved Phase 1 capacity, on-site power generation, and a utility substation with no queue risk. Kingsboro is structured for the right capital and offtaker partner and can move from NTP to COD in 6-9 months.
A purpose-built AI/HPC data campus in Bennettsville, South Carolina, scaled to 3.0 GW across ten repeatable 300 MW phases. Phase I establishes the electrical and thermal backbone for rapid deployment, with behind-the-meter firm power and no grid dependency from day one.
Beyond our active sites, OVMG is continuously evaluating new opportunities across greenfield, brownfield, and NTP-stage sites. The pipeline reflects our deal-first approach: every site is underwritten before it is brought to a partner.
Additional sites under active evaluation across the Southeast, selected for power access, regional demand, and deal viability.
Brownfield and conversion opportunities under review in the Mid-Atlantic corridor, evaluated for retrofit potential and connectivity.
We are continuously adding to the pipeline. If you have a site, reach out.<